Irbid – North Shouneh Road - Part 3

Contract Value: USD 12,733,548 – JOD 9,028,085

Employer: Ministry of Public Works & Housing

Consultant: Jouzy & Engicon

Location: Irbid – Jordan

Description: construction of a 14-kilometer-long road with four lanes separated by a central island and a width of (24.80) meters, carrying out excavation, backfilling, brushing and asphalt mixture works, carrying out rainwater drainage works, including pipe and box culverts, implementing the necessary traffic safety works, implementing two bridges, the first of which is the North Shouna Bridge with a length (235) meters, and (18) meters wide, with four lanes, number of openings (5), the length of one opening is (47) meters, and the second bridge is Kafr Asad, with a length of 38 meters and a width of (16) meters with two lanes, number of openings (2), the length of one opening (19) meter

dec 2000 - sep 2004